| No. |
Project |
Client |
Project Cost (RM) |
Project Description |
| 1. |
Title:-
Proposed Commercial Complex/ Development For Farmers Organisation Authority Sungai Besar, Selangor Darul Ehsan.
Status:-
Construction Completed
Images:- (View Photo)
|
Farmers Organisation Authority |
RM 2mil |
Piled foundation 3 storey building, Water Supply, Road works, drainage and Sewerage system.
Piled foundation on marine clay |
| 2. |
Title:-
Housing Scheme For Fishermen in Pasir Gogok, Kota Tinggi, Johor.
Status:-
Construction Completed
Images:- (View Photo)
|
Fishery Development Authority of Malaysia |
RM 5mil |
15acres development for
50 units low cost fishermen houses, Utility Hall and amenity bldgs., TNB single phase sub station, jetty and sorting area.
Road works, water supply, drainage and 5 PE individual sewerage system.
|
| 3. |
Title:-
Fishery Complex and Offices in Manjung, Sitiawan, Perak, Malaysia.
Status:-
Construction Completed
Images:- (View Photo)
|
O&L Jurutera Perunding / Fishery Development Authority of Malaysia |
RM 5mil |
Piled foundation 3 storey wet market, sorting area and administrative office.
Road work, hard standing, water supply, drainage and 150 PE sewerage system.
|
| 4. |
Title:-
Resettlement Of Squatters And Fishermen’s Housing Seberang Kota, Kuala Kedah, Malaysia.
Status:-
Construction Completed
Images:- (View Photo)
|
Kedah State Economic Planning, Unit, Malaysia / Muaraman Sdn Bhd |
RM 30mil |
65 acres development
674 units houses with double chamber sub station
Upgrading existing road works, redesign drainage system and 5 PE individual system
|
| 5. |
Title:-
Proposed Development Of heritage Centre & Maritime Centre At Putrajaya Administrative Centre, Putrajaya, Malaysia
Status:-
Construction Completed
Images:-
(View Photo1)
(View Photo2)
Artificial Beach (View Photo)
|
Putrajaya Corporation |
RM 75mil |
12.5 acres development of Heritage Park and Maritime Centre which consists of hotels, business complex, Malay Water Village & Viewing Tower, Waterfront Structure, Artifical Beach, Borneo Pavilion Emergency Rescue Centre, R.C. Ramp and Ferry Terminal, launching pontoon etc. Pre-bore spun piled foundation (both underwater and land ), R.C. lake edge wall, sub-soil drainage system, R.C. building and ERC structural steel building. |
| 6. |
Title:-
Proposed Development for Seri Malaysia Hotel On Lot Pt 12332, Malacca, Malaysia.
Status:-
Construction Completed
Images:- (View Photo)
|
Manistry of Tourism, Malaysia |
RM 13mil |
Hotel with 100 guest rooms, administration block, swimming pool, watch tower, lobby restaurant and staff café.
Slope protection with rock filled gabion and R.C retaining wall.
Road, water supply, MASMA drainage and 140 PE sewerage system |
| 7. |
Title:-
Proposed Development of Regatta Course and Promenade, Precinct 6, Putrajaya
(Watersport Complex Project At Precinct 6, Putrajaya)
Status:-
Construction Completed
Images:- (View Photo1)
(View Photo2)
(View Photo3)
|
Putrajaya Corporation |
RM 70mil |
9.5 acres development project which consists of Grand Stand with tensile membrane and steel structure roofing, Finish Tower structural steel building, Swimming pool complex with 1 level of basement, regatta course lanes, pontoons, boat launching ramp. Revetment, R.C. wall, softscape and hardscape.
Pre-bore spun piled foundation.
Road, water supply, MASMA drainage with STD and 2600 PE sewerage system |
| 8. |
Title:-
Medical Campus for Kuantan Hospital, Pahang, Malaysia
Status:-
Construction Completed
Images:- (View Photo) |
International Islamic University/ Hamidi Tech Sdn Bhd |
RM 30mil |
Design, manage and supervise for the design and build contractor to Medical Campus of the International Islamic University in Kuantan Hospital. Works involve lecture and operating theatres. |
| 9. |
Title:-
Primary School for Precinct 18, Putrajaya
Status:-
Design Completed
Images:-
|
Putrajaya Holdings Bhd. |
RM 30mil |
Primary school complex complete with classrooms, computer labs, canteen and playing field. |
| 10. |
Title:-
Maintenance and Upgrading of Primier Schools in Sembrong District, Johor, Malaysia
Status:-
Construction Stage
Images:-
|
Ministry of Education, Malaysia |
RM 18mil |
Design, project management and supervised the maintenance and upgrading works for 11 schools in Sembrong District, Johor. |
| 11. |
Title:-
Proposed Development of 8 Storeys Private Hospital for Kuantan Medical Centre at Kuantan, Pahang
Status:- Construction
.
Images:-
(View Photo) |
Kuantan Medical Centre |
RM 90mil |
10 acres development of Kuantan Medical Centre that consists of main hospital to cater 150 beds with the necessary facilities such as catering building, plant room building, air cond plant room building, refuse chamber and guard house.
For infrastructure works, water supply (50,000 gallon/day), road works, drainage with 1 dry pond system with area 4.60 acres at depth 1m and sewage treatment plant (STP) for 1,120 PE
Availability |
| 12. |
Title:-
Proposed Development Of Universiti Teknologi Mara At Jasin, Melaka
Status:-
Construction
Images:-
to be updated |
Universiti Teknologi Mara |
RM 250mil |
The development planned on 195.77 acres (79.23 ha.) to cater 5,000 students with the necessary facilities which approximately 84 acres is proposed to be developed with built up area and infrastructure, while the other 111 acres which is the existing forest will remain undisturbed and planned for Agro Agriculture.
Facilities provided are block faculties (computer science, science & mathematic and agriculture), administrative buildings, lecture halls (250 students), student accommodation (2,000 students), library (2,240 m2) and dining hall.
For infrastructure works divided into non-physical structures such as the open areas, green areas and the detention pond while the physical structures such as the water tank (500,000 gallon/day), mechanical sewage treatment plant (4325 PE), TNB substation, main distribution station, road, walkway, garbage house and domestic waste disposal area. |
| 13. |
Title:-
Cadangan Membina Dan Menyiapkan (Acmi) Air Combat Maneuvering Instrumentation Di Kuantan & Butterworth Tudm Base
Status:-
Construction Completed
Images:-
(View Photo)
(View Photo)
(View Photo) |
Aerotree Defense & Services Sdn Bhd |
RM 5mil |
Design of new single storey building for air combat maneuvering instrumentation by using steel frame structure including infrastructure works, water Supply, road works, MASMA drainage system and individual septic tank for 45 PE. |
| 14. |
Title:-
Cadangan Merekabentuk, Membina Dan Menyiapkan Pusat Latihan Teknologi Tinggi (Adtec) Kemaman, Terengganu Darul Iman
Status:-
Construction Completed
Images:-
to be updated |
Kementerian Sumber Manusia |
RM 120mil |
61.24 acres of new development area for educational institution including administration building, lecture halls, cafeteria, workshops, mosque, dining hall, 4-storey hostels, 5-storey apartments, 2-storey bungalows, grandstand, main store, pump house, guardhouse, TNB substation and elevated water tank.
For infrastructure works, water supply (62,040 gallon/day), road works, drainage with on site detention pond system and sewage treatment plant (STP) for 2,1610 PE |
| 15. |
Title:-
Proposed Development of International University College of Automotive (ICAM) Student Village On Pt 13225, Pekan, Pahang.
Status:-
Construction Stage
Images:- to be updated |
Glenmarie Properties Sdn Bhd |
RM 130mil |
The development planned to cater 5,000 students with the necessary facilities that approximately 22 acres built up area. This project will be implementing the Bioecods System and the Green Building Index.
The main buildings that are proposed in this development are construction of piled foundation of five block of 12 storey student hostel, two blocks of 12 storey staff apartment, one block 4 storey visiting lecturer’s apartment, one block 4 storey visiting lecturer’s apartment, one multi purpose hall, cafeteria cum commercial center and TNB substation.
For infrastructure works, water supply (235,000 gallon/day), road works, drainage (Bioecods System) includes the OSD pond and sewage treatment plant (STP) for 6,100 PE. |