| No. |
Project |
Client |
Project Cost (RM) |
Project Description |
| 1. |
Title:- Kuala Perlis Port Study, Malaysia
Status:- Project Completed
Images:- (View Photo1)
(View Photo2)
(View Photo3)
(View Photo4)
(View Photo5) |
Marine Department/Ministry of Transport |
RM 350mil |
Engineering economic and marketing for the feasibility study of Kuala Perlis Port. Study involves hydraulic, port and maritime engineers and economic analysis. |
| 2. |
Title:- Planning of Waterfront Facilities for Nusajaya, Johor, Malaysia.
Status:- Project Completed
Images:- Ferry Terminal Layout
(View Photo)
Marina Layout
(View Photo)
|
United Engineers Malaysia Bhd/
Perunding Padureka
|
RM 60mil |
Analyse and preparing urban design guideline for the waterside facilities of the waterfront facilities in Nusajaya. Guideline involve the public marina, commercial marina, public ferry terminal, cruise terminal and private berth. |
| 3. |
Title:- Ferry Terminal for Sabah Port, Malaysia (Tawau/Kota Kinabalu)
Status:- Project Completed
Images:- (View Photo) |
Sabah Port Authority/MDS TransAsia |
RM 10mil |
Analyse and prepare guideline for the planning of ferry terminal in Tawau and Kota Kinabalu, Sabah, Port. |
| 4. |
Title:- Maritime Auditor for Submarine Base for Royal Malaysian Navy, Sepanggar Bay, Sabah
Status:- Project Completed
Images:- (View Photo) |
Public Works Department |
RM 120mil |
Analyse, audit and comment on the maritime engineering works for the installation of submarine base for Royal Malaysian Navy. |
| 5. |
Title:- Acquaculture Farm, Bagan Lalang, Sepang, Selangor
Status:- Project Completed
|
Majuikan Sdn Bhd (subsidary of Fishery Development Authority of Malaysia) |
RM 2mil |
Analyse, audit, comment and project management for the aquaculture farm for the breeding of Barramundi. |
| 6. |
Title:- Master Plan Study for Flood Mitigation and River Management for Muar River Johor
Status:- Project Completed
|
Irrigation adn Drainage Department Malaysia/ Hydec Engineering Sdn Bhd |
RM 150mil |
Analyse and prepare guideline for the infrastructure required for the flood mitigation and river management of Muar River. |
| 7. |
Title:-
Project Management and Supervision of Expansion to the Mooring Basin of Kuantan, Port, Malaysia
Status:- Project Completed
Images:- (View Photo) |
Ministry of Transport |
RM 110mil |
Auditing, project management and supervisory works for the dredging of the inner basin extension of Kuantan Port, Malaysia.
|
| 8. |
Title:-
Proposed Value Engineering Exercise for Phase J-9, Denai Alam, Shah Alam, Selangor
Status:-
Construction
Images:-
to be updated |
Sime Darby Property |
RM 60mil |
Carrying out a technical assessment and value engineering to the development of 194 units two and three storey houses that consists Type A, Type B, Type C, Type D and Type E. Replacement of piled structure to raft foundation on engineering filled area. |
| 9. |
Title:-
The Principal Consultant for The Agropolitan Project and Resettlement at North Kelantan Agropolitan (NKA) In The Districts of Macang, Pasir Mas and Pasir Puteh, Kelantan.
Status:-
Design Stage
Images:- to be updated |
East Coast Economic Region Development Council (ECERDC) | RM 100mil |
5 site of 63 acres development areas that consist of ‘Padang Ragut’, Management Office, Shed Type A & B, Participant's house, Balairaya, Guard house, Store & Work Area, Tinja Fertiliser Storage, Surau, Lorry Garage, TNB Substation and others including infrastructure works, water supply (12,000 gallon/day), individual septic tank (300 PE), tube well for shed, road works, drainage system with proposed 3 nos. of on-site detention pond and irrigation pond |