| No. |
Project Status |
Client |
Project Cost (RM) |
Project Description |
| 1. |
Beautification Works at Bernam Riverbank , Sabak Bernam, Selangor.
(View Photo)
Construction Completed |
Public Works Department, Malaysia |
26 mil |
River bank protection works, jetty and ramp, river beautification works including buildings on soft marine clay. |
| 2. |
Beautification Works at Kuala Melaka Riverbank, Pulau Langkawi Kedah.
(View Photo)
Construction Completed |
Langkawi Development Board (LADA) |
25.0 mil |
Eco-tourism development along river front.
Construction of bridge, inflatable rubber dam and locks, pier, viewing tower, fisherman complex, market, food stalls, floating restaurant, pontoon, bicycle rental station, workshop, administration amenity buildings, road, drainage, sewerage and water supply. |
| 3. |
Bridge Assessment / Repair/ Repair at Federal Roads, Terengganu.
Construction Stage |
Public Works Department, Malaysia |
20.0 mil |
Appraisal on existing 57 nos bridges on federal road in Terengganu.
Design new integral bridges including the approach road temporary road diversions and other miscellaneous works. |
| 4. |
Road Construction at RISDA/ Telok Caruk Bemban Village, Kupang, Baling, Kedah Darul Aman.
(View Photo)
Design Completed |
Public Works Department |
8.0 mil |
Upgrading 6 km existing rural road to modified R3 JKR Standard with 2.5m width paved shoulder |
| 5. |
Proposed Tiger Prawn Breeding Pond at:
- Kerian, Perak
- Sg. Chenaam, Pulau Pinang
(View Photo)
- Tg. Piandang, Perak
- Kuala Kurau, Perak
- Pantai Tedong
- Tedung Pantai Merlimau, Melaka
(View Photo)
- Rompin, Pahang (7 hectares)
(View Photo)
- Pantai Bernas
- Kuala Kerian
- Penor Village, Kuantan
Construction Stage |
Farmers Organisation Authority |
8.0 mil |
Farming ponds development of stocking pond, treatment pond using gravity flow and pumping system with intake channel, storage/stabilization pond, outlet channel and perimeter earth bund. |
| 6. |
Selayang Slope Failure, Bandar Baru Selayang, Selangor
(View Photo)
Construction Completed |
Public Works Department, Malaysia/
Perangsang International Sdn Bhd |
2 mil |
Design of new slope that has failed due to poor drainage. Benching with granite rocks incorporated in the slope stabilisation introduced. |